Saturday, November 19, 2011

Progress

Our trailer was in the driveway yesterday morning. It had evidently been delivered either pretty late in the evening or very early in the morning. The man who was working on it had said he and his wife would be going out of town for two weeks. It was very thoughtful of him to make sure we had it available during that period.

He has removed the steel ramp and replaced the original tail gate using hinges. He also put in some hardware to facilitate carrying a lighter, removable ramp on the tongue end of the trailer. A loaner ramp was in that area. His aluminum ramp folds in half, and because the spaces between the ramps braces was large enough that the wheelchair wheels would get caught, he has placed small pieces of plywood in them. This ramp is still a bit heavy, but certainly better than the steel ramp when it comes to weight.

Now I can move the trailer on my own again. I have also ordered a light weight portable wheelchair ramp on line. It separates into two sections and each section folds up. They can be carried with handles like two suitcases and stored in the car trunk. The ramp should be delivered in a couple weeks.

While this project is far from complete, the progress has been remarkabe. It has provided the gift of friendship between people who, to this point, did not know of the other's existance. It has also provided for a much needed service, a true blessing all the way around. We have much to be thankful for.

1 comment: